
Truck-mounted Telescopic Conveyors - Telebelts
TB 130
 

Click on any image above for
a larger view.
- 130 foot Horizontal Reach
- Fully Hydraulic Feed Conveyor
- 360° Continuous Rotation of Feeder and Main
- Max. Rated Output up to 360 yd3/hr (275m3/hr)
- Handle Concrete from 0-inch-to-12-inch Slumps (0
to 305mm)
- Place Materials Sized from Sand to 4 inch (100mm)
- RockSetup
and Operate Under Low 15-foot-4-inch (4.7m) Heights
|
Conveyor Specifications |
|
| Conveyor
horizontal reach |
|
|
Maximum at 0° |
105 ft
|
(32.00m)
|
|
Maximum at 30°
|
90 ft
|
(27.43m)
|
| Conveyor
belt width |
18 in
|
(457mm)
|
| Feed
conveyor length |
40 ft
|
(12.19m)
|
| Feed
conveyor belt width |
18 in
|
(457mm)
|
| Trunk/end
hose length |
15 ft
|
(4.57m)
|
| |
|
|
| Discharge
height |
|
|
|
Maximum at 30° |
58 ft / 8 in
|
(17.88m)
|
|
Minimum at -18° |
-39 ft / 4 in
|
(-11.99m)
|
| Rated
capacity at 0° |
6 yd3/min
|
(4.6 m3/min)
|
|
main & feed conveyors |
360 yd3/hr
|
(275 m3/hr)
|
| Rated
capacity up to 20° |
3.8 yd3/min
|
(2.9 m3/min)
|
|
main & feed conveyors |
230 yd3/hr
|
(175 m3/hr)
|
|
|
TB 130
Range Diagram

|
At 0° elevation-98'0"
(29.87m) net reach, comparable to a 36 meter boom pump
At 0° elevation-approx. 105' (32m) horizontal reach
|
|
|
| Net
reach beyond outriggers |
|
at 0°
|
97 ft / 0 in
|
(29.57m)
|
|
at 30°
|
84 ft / 2 in
|
(25.65m)
|
| |
|
|
| Outrigger
spread |
| Front,
swing-out |
24 ft / 2 in
|
(7.37m)
|
| Rear, swing-out
|
25 ft / 2 in
|
(7.67m)
|
|
|
|
Water tank capacity
|
200 gal
|
(757L)
|
|
Hydraulic oil tank capacity with
cooler
|
150 gal
|
(568L)
|
|
|
|
Weight
|
20,806 lbs
|
(9438kg)
|
| Wheelbase |
300 in
|
(7620mm)
|
| Cab Height |
104 in
|
(2642mm)
|
| Steering
Radius |
45 ft / 6 in
|
(13.87m)
|
| Steering
Angle |
38
|
|
| Fuel tank
capacity |
110 gal
|
(416L)
|
|
Transmission
|
Mack T2090 9 Speed
|
|
|
All specifications apply to units
mounted on Mack RD 688S
|
| |
| Transport
Axle Weights - lbs. (kg) Based on Model Mack
RD 688S |
|
Steering
|
Pusher
|
Tandem
|
Total
|
|
19,108 (8666)
|
10,000 (4535)
|
30,752 (13,947)
|
59,860 (27,148)
|
|
22,875 (10,374)
|
Up
|
36,985 (16,774)
|
59,860 (27,148)
|
|
|
 Wall
Foundations
The telebelt's extremely smooth 'surge-free' flow from the trunk
is not abrasive on forms, makes life easier on the horseman and
reduces the need for extra labor.
Back to top

 Footings
Place concrete and then stone - all the same day and from the same
setup -easily justifying the cost of a versatile belt conveyor over
other methods.
Back to top

 Outdoor
Slabs
The conveyor's easy setup and teardown allow several pours in a
day. It can quickly move from one location to the next on large
slabs...virtually without interruption in placing concrete.
Back to top

 Warehouse
Slabs
Use the full horizontal reach of the Telebelt even under low 16
ft. (4.8 m) heights, making this versatile unit the perfect choice
for inside, low ceiling work.
Back to top

 Mat
Pours
Discharge a typical load in record time with the telebelt's high
volume output. Plus, you can increase the aggregate size to reduce
cement costs and help your customers save money.
Back to top

 Bridges
Use a belt conveyor for your next 'scrutinized' bridge deck pour.
It's certified to have no significant air loss of concrete, and
it's known for its high reliability.
Back to top

 Stone
and More
Place stone, gravel, rock, sand, backfill and more. Just imagine
all the possibilities in your area for handling various materials...and
growing your business even further.
Back to top

 Move
More Than Just Concrete
Add versatility to your projects with the conveyor's ability to
handle several different materials...and handle it with less worry
about plug-ups.
Back to top

|